Read more
CAEE Chair Gongkang Fu spoke with the Chicago Sun-Times about the challenges of replacing the Wells Street Bridge over the Chicago River, a fixed-trunnion bascule bridge that presents some unique challenges.
April 29, 2013Posted in: Illinois Tech In the News